+ 998 71 254 73 73
info@uzphm.uz

+ 998 71 254 73 73
info@uzphm.uz

Reconstruction and overhaul of HVAC systems in technical building blocks of the REPUBLICAN SPECIALIZED CENTER OF SURGERY named of academician V. Vakhidov


Starting in 2015, the O’ZPROMHOLODMONTAJ company starts to perform general construction works. On the instructions of the Prime Minister of Uzbekistan, the reconstruction and overhaul of engineering systems for heating, ventilation and air conditioning of the technical unit of the building of the Republican Specialized Center of Surgery named after Academician V. Vakhidov were carried out.

 

The company’s specialists built five modern operating rooms on the seventh floor of the Center, equipped with the latest technology, installed and installed all engineering communications (climate control, heating, water supply, ventilation), which are managed remotely.

 

In addition, the O’ZPROMHOLODMONTAJ specialists were tasked with maximizing air purification in the operating theaters during the most complex operations, including open-heart surgery. The highest requirements for a high level of sterility in operating rooms during operations are explained by the high percentage of postoperative complications arising from the lack of sterility of air in the room. To solve this problem, absolute high-performance filters were installed, which are used in hospitals and clean air rooms to trap micron and submicron particles. Filters guarantee the necessary level of pollution control in the environment and are used in world practice to trap particularly small particles in the air – bacteria, spores, viruses, with dust separation efficiency up to 99.999995%.